Square Drive Type - TSL Series


1 / 3
Turbine Closure System
2 / 3
Turbine Closure System
3 / 3
Turbine Closure System

Catalogue

Features


The Turbine Closure System reduces the Tops On/Off me by 6 hours per each casing. On average it looks to save you over a day's me of maintenance. Our Tritorc Turbine Closure System ensures the Casings are closed Hydraulically thereby elimina ng the need to heat the studs for this purpose.

Benefits:
  • Faster Opera on Time
  • Safer To Use
  • Accurate Load Delivery
  • Easy to Operate
  • Requires less Manpower
  • Efficient

Typical Operating Procedure for the TCS

  1. Assemble the TCS in the designated Bolt loca on
  2. Interconnect the hoses supplied with the TCS and one common connec on to the Powerpack
  3. Pressurize the Pump at regular intervals of 100 bar & simultaneously measure the Zero Gap
  4. Once the desired Zero Gap is achieved, lock the Puller Bar of the TCS with the lock nut provided
  5. Release the Hydraulic Pressure from the TCS and dismantle the hoses and remove the Load Cell and Bridge
Turbine Closure System

Get in Touch

Enter your first name
Enter your last name
Enter a valid email address
Enter Country Code
Enter your last name
Enter your company name
Enter your required Product
Yes
By clicking Get A Quote I confirm that I have read and agree to the Privacy Statement.
This is a required field
Footer | Tritorc