#casestudy


  • Challenges faced in pipeline and structural bolting

    Challenges faced in pipeline and structural bolting

    Bolted joints present several difficulties, which can appear during the assembly…

  • Hot Tapping Operation at B193, 28 Hours from shore

    Hot Tapping Operation at B193, 28 Hours from shore

    Tritorc secured a challenging offshore hot tapping project from one of…